**ALL ORDERS PLACED BEFORE 4 PM ET WILL SHIP THE SAME DAY - FREE SHIPPING EVERY ITEM EVERY DAY**
Storm Hy-Road Drilling Layout 1
- Locate the mass bias by drawing a line from the pin through the CG. Find the location 6 3/4" from the pin along this line, and mark it with "MB". This is the location of the mass bias or the secondary pin
- Place the major pin 5" from the player's PAP and place the "MB" on the player's ball track next to the thumb hole
- Use this layout for length with a medium backend reaction.
- This layout is great for medium to light oil. Also works well for players with higher rev rates.