Layout 4 - Low RG Layout


  • Ball Motion - Early Hook with smooth arc
  • Lane Condition - Fresh backends and wet/dry
  • Flare Potential - Low
  • Pin Placement - Place pin at 1 - 2" from the positive axis point (PAP)
  • Balance Hole - If needed, place the balance hole at 4-5" from the center of span on a line through the center of gravity

Hammer Symmetrical Layout 4