Layout 2 - Strong Arc

  • Ball Motion - Strong arcing hook (about 2-4 boards less than Drilling #1)
  • Lane Condition - Medium Oil
  • Flare Potential - Medium (3-5")
  • Pin Placement - Place pin at 4 - 5" from the positive axis point (PAP)
  • HART Placement - Place HART 2" right of the ball track
  • Balance Hole - If needed, place the balance hole 4" from the center of the span on a line through the center of gravity

Hammer HART Drilling Layout